QUT ePrints

Subjective and objective stress in construction cost estimation

Leung, Mei-Yung, Skitmore, Martin, & Chan, Yee Shan (2007) Subjective and objective stress in construction cost estimation. Construction Management and Economics, 25(10), pp. 1063-1075.

View at publisher

Abstract

Cost estimators play an important role in an organization, as they produce the majority of predictions of probable final construction cost. Care is needed as both under and overestimates can be costly. The nature of the task is also such that the work has to be done in a restricted amount of time. It is likely, therefore, that the people involved are likely to experience a considerable amount of mental and emotional stress as a result.

Types of stress can be divided into objective stress (OS), occurring as a result of events experienced, and subjective stress (SS) and emotional exhaustion (EE), which are a function of the demands of the situation created by those events. Since stress may be influenced by different stressors, and subsequently affect the type of stress management needed, the research described in this paper examined the relationships between OS, SS, EE and stressors by a survey of 73 construction cost estimation personnel. T-test, factor analysis, correlation analysis and linear regression analysis were applied to identify differences between the professional estimators and other personnel and the types of stress endured.

The results indicate that the stress levels of both the professional estimators and other personnel are similar, with OS being significantly higher than SS, which is in turn significantly higher than EE. For professional estimators, increased levels of OS were found to be mainly associated with workload, lack of autonomy and inappropriate feedback. Increased SS and EE, on the other hand, appeared to be a function of conflict (team/value/family), distrust, inappropriate feedback, and unfair reward and treatment.

Impact and interest:

17 citations in Scopus
Search Google Scholar™

Citation countsare sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

132 since deposited on 01 May 2008
43 in the past twelve months

Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 13403
Item Type: Journal Article
Additional Information: The author-version of this article will be available 18 months after publication. For more information, please refer to the journal's website (see hypertext link) or contact the author. Author contact details: rm.skitmore@qut.edu.au
Keywords: Cost estimator, emotional exhaustion, objective stress, subjective stress, stress, stressors
DOI: 10.1080/01446190701573296
ISSN: 1466-433X
Subjects: Australian and New Zealand Standard Research Classification > BUILT ENVIRONMENT AND DESIGN (120000) > BUILDING (120200) > Quantity Surveying (120203)
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Past > Schools > School of Urban Development
Copyright Owner: Copyright 2007 Taylor & Francis
Copyright Statement: First published in Construction Management and Economics 25(10):pp. 1063-1075.
Deposited On: 01 May 2008
Last Modified: 29 Feb 2012 23:38

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page