Causes of delays in Saudi Arabian public sector construction projects

Al-Kharashi, Adel & Skitmore, Martin (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(1), pp. 3-23.

View at publisher

Abstract

Many public construction projects have been undertaken throughout the Kingdom of Saudi Arabia as part of the government’s national development plans in the last three decades, with significant public expenditure involved. One of the critical problems concerning these projects is the frequent and lengthy delays that occur. In order to improve the situation, it is first necessary to identify the major causes involved. Several studies have already been reported which do this but all use different sets of variables. Also, none have attempted to identify the extent to which improvements are possible in practice. A new survey is reported that uses all the variables from the previous work and that are measured for both current degree of effect on delays and the extent to which each can be practically improved. These are contained in seven groupings: client, contractor, consultant, materials, labour, contract and relationship-related causes. The survey covers a sample of 86 clients, contractors and consultants working in the Saudi construction industry. The analysis reveals some considerable heterogeneity between the cause groupings and respondent groupings in terms of means and correlations, apparently partly due to lack of knowledge of respondents and a tendency for the consultants to blame the contractors for the delays and vice versa. The main results, therefore, are disaggregated to reflect the views of each respondent group concerning each group of causes. In general however, it is found that the most influencing current cause of delay is the lack of qualified and experienced personnel – attributed to the considerable amount of large, innovative, construction projects and associated current undersupply of manpower in the industry.

Impact and interest:

13 citations in Scopus
Search Google Scholar™

Citation countsare sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

3,495 since deposited on 10 Jun 2009
881 in the past twelve months

Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 21066
Item Type: Journal Article
Additional URLs:
Keywords: Saudi Arabia, delays, heterogeneity
DOI: 10.1080/01446190802541457
ISSN: 0144-6193
Subjects: Australian and New Zealand Standard Research Classification > BUILT ENVIRONMENT AND DESIGN (120000) > BUILDING (120200) > Building Science and Techniques (120202)
Australian and New Zealand Standard Research Classification > BUILT ENVIRONMENT AND DESIGN (120000) > BUILDING (120200) > Building Construction Management and Project Planning (120201)
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Past > Schools > School of Urban Development
Copyright Owner: Copyright 2009 Routledge
Deposited On: 10 Jun 2009 13:24
Last Modified: 29 Feb 2012 23:54

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page