Comparison between ACI 440 and FIB 14 design guidelines in using CFRP for strengthening of a concrete bridge headstock

Nezamian, A & Setunge, S (2004) Comparison between ACI 440 and FIB 14 design guidelines in using CFRP for strengthening of a concrete bridge headstock. In 4th International Conference on Advanced Composite Materials in Bridges and Structures, 20−23 July 2004, Calgary, Alberta.

Abstract

This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.

Impact and interest:

Citation counts are sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

2,338 since deposited on 15 Sep 2009
246 in the past twelve months

Full-text downloads displays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 27373
Item Type: Conference Paper
Refereed: No
Keywords: CRC for Construction Innovation, Program C : Delivery Management of Built Assets , Project 2002-005-C : Decision Support Tools for Concrete Infrastructure Rehabilitation
Copyright Owner: Copyright 2004 Icon.Net Pty Ltd
Copyright Statement: The Participants of the CRC for Construction Innovation have delegated authority to the CEO of the CRC to give Participants permission to publish material created by the CRC for Construction Innovation. This delegation is contained in Clause 30 of the Agreement for the Establishment and Operation of the Cooperative Research Centre for Construction Innovation. The CEO of the CRC for Construction Innovation gives permission to the Queensland University of Technology to publish the papers/publications provided in the collection in QUT ePrints provided that the publications are published in full. Icon.Net Pty Ltd retains copyright to the publications. Any other usage is prohibited without the express permission of the CEO of the CRC. The CRC warrants that Icon.Net Pty Ltd holds copyright to all papers/reports/publications produced by the CRC for Construction Innovation.
Deposited On: 15 Sep 2009 02:40
Last Modified: 10 Aug 2011 17:22

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page