Motivational misalignment on an iconic infrastructure project

Rose, Timothy M. & Manley, Karen (2010) Motivational misalignment on an iconic infrastructure project. Building Research and Information, 38(2), pp. 144-156.

[img]
Preview
18-months embargo period (PDF 357kB)
Accepted Version.

View at publisher

Abstract

Aligning the motivation of contractors and consultants to perform better than ‘business-as-usual’ (BAU) on a construction project is a complex undertaking and the costs of failure are high as misalignment can compromise project outcomes. Despite the potential benefits of effective alignment, there is still little information about optimally designing procurement approaches that promote motivation towards ‘above BAU’ goals. The paper contributes to this knowledge gap by examining the negative drivers of motivation in a major construction project that, despite a wide range of performance enhancing incentives, failed to exceed BAU performance. The paper provides a case study of an iconic infrastructure project undertaken in Australia between 2002 and 2004. It is shown that incentives provided to contractors and consultants to achieve above BAU performance can be compromised by a range of negative motivation drivers including: • inequitable contractual risk allocation; • late involvement of key stakeholders; • inconsistency between contract intentions and relationship intentions; • inadequate price negotiation; • inconsistency between the project performance goals and incentive goals; •unfair and inflexible incentive performance measurement processes. Future quantitative research is planned to determine the generalisability of these results.

Impact and interest:

3 citations in Scopus
Search Google Scholar™
2 citations in Web of Science®

Citation counts are sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

183 since deposited on 04 May 2010
12 in the past twelve months

Full-text downloads displays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 32099
Item Type: Journal Article
Refereed: Yes
Additional URLs:
Keywords: motivation, construction projects, incentives, contracts, performance
DOI: 10.1080/09613210903503741
ISSN: 0961-3218
Subjects: Australian and New Zealand Standard Research Classification > BUILT ENVIRONMENT AND DESIGN (120000) > BUILDING (120200) > Building Construction Management and Project Planning (120201)
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Past > Schools > School of Urban Development
Copyright Owner: Copyright 2010 Routledge
Copyright Statement: This is an electronic version of an article published in [Building Research and Information, 28(2), pp.144-156]. [Building Research and Information] is available online at informaworldTM
Deposited On: 04 May 2010 22:41
Last Modified: 29 Feb 2012 14:15

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page