Kajewski, Stephen L. (2005) Multilevel formwork load distribution with posttensioned slabs. Journal of Construction Engineering and Management, 131(2), pp. 203-210.

View at publisher

Abstract

Formwork and the associated shoring represent a significant proportion of the costs associated with the construction of multi-level concrete structures. To minimize these costs, a limited number of formwork and shoring sets are recycled up the structure as construction progresses, eliminating the need for a new set of formwork and shoring with each new slab. When a slab is post-tensioned using draped tendons, slab lift occurs as a portion of the slab self-weight is balanced. The formwork and shores supporting that slab are unloaded by an amount equivalent to the load balanced by the post-tensioning. This produces a load distribution through the structure that is inherently different from that of a conventionally reinforced slab. This paper presents two design methods suitable for modeling the multi-level formwork process for post-tensioned slabs: a modification to the simplified analysis method and a finite element model – both techniques will be of immediate use by industry practitioners and of interest to researchers examining the load distribution phenomenon. The paper also summarizes the findings of one of only a few research projects (Kajewski, 1997, 1998) in which actual shore loads were monitored during the construction of a multi-level post-tensioned building, which is used to validate the proposed design models.

Impact and interest:

1 citations in Scopus
Search Google Scholar™
1 citations in Web of Science®

Citation countsare sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

1,642 since deposited on 30 Mar 2006
430 in the past twelve months

Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 3700
Item Type: Journal Article
Keywords: concrete construction, formwork, post, tensioned concrete, post, tensioning, structural design
DOI: 10.1061/(ASCE)0733-9364(2005)131:2(203)
ISSN: 0733-9364
Subjects: Australian and New Zealand Standard Research Classification > TECHNOLOGY (100000)
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Past > Schools > School of Urban Development
Copyright Owner: Copyright 2005 American Society of Civil Engineers
Copyright Statement: Reproduced in accordance with the copyright policy of the publisher.
Deposited On: 30 Mar 2006
Last Modified: 29 Feb 2012 23:11

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page