QUT ePrints

Optimisation of train schedules to achieve minimum transit times and maximum reliability

Higgins, Andrew, Ferreira, Luis, & Kozan, Erhan (1996) Optimisation of train schedules to achieve minimum transit times and maximum reliability. In 13th International Symposium on Transportation and Traffic Theory, 24-26 July 1996, Lyon, France.

Abstract

The overall timetable reliability is a measure of the likely performance of the timetable as a whole, in terms of schedule adherence. The concept is a critical performance measure for both urban and non-urban rail passenger services, as well as rail freight transportation. This paper deals with the scheduling of trains on single track corridors, so as to minimise train trip times and maximise reliability of train arrival times.

A method used to quantify the amount of risk of delay associated with each train, each track segment, and the schedule as a whole, is used as the reliability component of the constrained optimisation model. The methodology used to estimate the risk of delay is put forward. The paper also describes a number of alternative solution techniques for the scheduling problem. These techniques include exact optimal solutions using branch and bound, and heuristic approaches, such as genetic algorithms, nearest neighbourhood heuristic and tabu search. Some of the results of using these alternative approaches are briefly described.

The schedule produced using risk of delay in the objective function, will be the most efficient in terms of delay due to train conflicts and delay that may occur due to unexpected events. The model and solution techniques are applied to the problem of determining improved positions of sidings on a single track corridor, with respect to a given schedule.

Impact and interest:

Citation countsare sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

397 since deposited on 31 Mar 2006
97 in the past twelve months

Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 3793
Item Type: Conference Paper
Additional URLs:
Keywords: optimisation, scheduling, train timetable, transit time, delay, reliability, heuristic
ISBN: 0080425860
Subjects: Australian and New Zealand Standard Research Classification > COMMERCE MANAGEMENT TOURISM AND SERVICES (150000) > TRANSPORTATION AND FREIGHT SERVICES (150700) > Rail Transportation and Freight Services (150702)
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Copyright Owner: Copyright 1996 Elsevier
Copyright Statement: Reproduced in accordance with the copyright policy of the publisher.
Deposited On: 31 Mar 2006
Last Modified: 09 Jun 2010 22:31

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page