Analytical and approximate variance of total project cost
Skitmore, Martin & Ng, S. Thomas (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460.
Abstract
The statistical variance of total project cost is usually estimated by means of Monte Carlo simulation on the assumption that exact analytic approaches are too difficult. This paper tests that assumption and shows that, contrary to expectations, the analytic solution is relatively straightforward. It is also shown that the coefficient of variation is unaffected by the size (floor area) of the project when using standardized component costs. A case study is provided in which actual component costs are analyzed to obtain the required total cost variance. The results confirm previous work in showing that the approximation of the second moment (variance) under the assumption of independence considerably underestimates the exact value. The analysis then continues to examine the effects of professional judgement and, with the simulated data used, the approximation is shown to be reasonably accurate – the professional judgement absorbing most of the intercorrelations involved. An example is also given in which the component unit quantities are priced by their average unit costs and which again shows that the approximation to be close to the true value. Finally, this is extended to show how the exact total project cost variances may be obtained for each project.
Citations:
Citation countsare sourced monthly from Scopus and Web of Science citation databases.
These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science generally from 1980 onwards.
Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.
Full-text downloads:
Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.
| ID Code: | 4113 |
|---|---|
| Item Type: | Journal Article |
| Keywords: | Cost, components, distribution, variance, covariance, coefficient of variation, independence assumption, correlation, Monte Carlo simulation, professional judgement |
| DOI: | 10.1061/(ASCE)0733-9364(2002)128:5(456) |
| ISSN: | 0733-9364 |
| Subjects: | Australian and New Zealand Standard Research Classification > BUILT ENVIRONMENT AND DESIGN (120000) > BUILDING (120200) > Quantity Surveying (120203) |
| Divisions: | Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering |
| Copyright Owner: | Copyright 2002 American Society of Civil Engineers |
| Copyright Statement: | Reproduced in accordance with the copyright policy of the publisher. |
| Deposited On: | 27 Nov 2006 |
| Last Modified: | 09 Jun 2010 22:32 |
Export: EndNote | Dublin Core | BibTeX
Repository Staff Only: item control page