Drew, Derek S., Lo, Hing Po, & Skitmore, Martin (2001) The effect of client and type and size of construction work on a contractor's bidding strategy. Building and Environment, 36(3), pp. 393-406.

View at publisher

Abstract

This paper offers a bidding strategy model for use by contractors as part of a more informed approach in selecting which contracts to bid for, and as a basis for determining the most appropriate mark-up level for various types and sizes of construction work and client types. Regression analysis is used in measuring a contractor’s competitiveness between bids (by using the lowest bid / own bid ratio) and within bids (by using the lowest bid / cost estimate ratio) according to type and size of construction work and client type. The model was tested on a large and reputable Hong Kong contractor. This particular contractor's bidding behaviour was found to be largely unaffected by type of construction work but significantly affected by client type and size of construction work. Three quadratic models (regressing lowest bid / cost estimate on size of construction work) are also successfully developed for projects from the private sector, the Hong Kong Government and the Hong Kong Housing Authority respectively.

Impact and interest:

19 citations in Scopus
Search Google Scholar™
12 citations in Web of Science®

Citation countsare sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

3,345 since deposited on 16 May 2006
1,320 in the past twelve months

Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 4117
Item Type: Journal Article
Keywords: Bidding strategy, construction work type, construction work size, client, mark, up, competitiveness, regression analysis
DOI: 10.1016/S0360-1323(00)00009-3
ISSN: 0360-1323
Subjects: Australian and New Zealand Standard Research Classification > TECHNOLOGY (100000)
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Copyright Owner: Copyright 2001 Elsevier
Copyright Statement: Reproduced in accordance with the copyright policy of the publisher.