An Integrated Regression Analysis and Time Series Model for Construction Tender Price Index Forecasting
Ng, S. Thomas, Cheung, Sai On, Skitmore, Martin, & Wong, Toby C. Y. (2004) An Integrated Regression Analysis and Time Series Model for Construction Tender Price Index Forecasting. Construction Management and Economics, 22(5), pp. 483-493.
Abstract
Clients need to be informed in advance of their likely future financial commitments and cost implications as the design evolves. This requires the estimation of building cost based on historic cost data that is updated by a forecasted Tender Price Index (TPI), with the reliability of the estimates depending significantly on accurate projections being obtained of the TPI for the forthcoming quarters. In practice, the prediction of construction tender price index movement entails a judgemental projection of future market conditions, including inflation. Statistical techniques such as Regression Analysis (RA) and Time Series (TS) modelling provide a powerful means of improving predictive accuracy when used individually. An integrated RA-TS model is developed and its predictive power compared with the individual RA or TS models. The accuracy of the RA-TS model is shown to outperform the individual RA and TS models in both one and two-period forecasts, with the integrated RA-TS model accurately predicting (95% confidence level) one-quarter forecasts for all the 34 holdout periods involved, with only one period not meeting the confidence limit for two-quarter forecasts.
Citations:
Citation countsare sourced monthly from Scopus and Web of Science citation databases.
These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science generally from 1980 onwards.
Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.
Full-text downloads:
Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.
| ID Code: | 4135 |
|---|---|
| Item Type: | Journal Article |
| Keywords: | Cost estimate, integrated forecasting model, tender price index forecast, time series modelling, regression analysis |
| DOI: | 10.1080/0144619042000202799 |
| ISSN: | 1466-433X |
| Subjects: | Australian and New Zealand Standard Research Classification > BUILT ENVIRONMENT AND DESIGN (120000) > BUILDING (120200) > Quantity Surveying (120203) Australian and New Zealand Standard Research Classification > BUILT ENVIRONMENT AND DESIGN (120000) > BUILDING (120200) > Building Construction Management and Project Planning (120201) |
| Divisions: | Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering |
| Copyright Owner: | Copyright 2004 Taylor & Francis |
| Copyright Statement: | First published in Construction Management and Economics 22(5):pp. 483-493. |
| Deposited On: | 16 May 2006 |
| Last Modified: | 29 Feb 2012 23:04 |
Export: EndNote | Dublin Core | BibTeX
Repository Staff Only: item control page