Identifying the important causes of delays in bulding construction projects

Alwi, Sugiharto & Hampson, Keith D. (2003) Identifying the important causes of delays in bulding construction projects. In The 9th East Asia-Pacific Conference on Structural Engineering and Construction, 16-18 December 2003, Bali, Indonesia.

Abstract

Delay in the completion of a construction project can be a major problem for contractor companies leading to costly disputes and adverse relationships amongst project participants. Projects can be delayed for a large number of reasons. The reasons are related to the various types of uncertainty associated with activities during the construction process. This research was conducted to determine the most important causes of delays within building projects in Indonesia. A questionnaire survey was carried out targeting 89 respondents from large contractors and 23 respondents from small contractors. The respondents were asked to assess the level of effect the 31 potential delay causes on their projects. The delay factors were grouped into six major groups. The level of importance of the delay variables and the groups were computed and ranked for both the large and small contractors. Personal interviews were conducted to clarify responses. The agreement between the rankings of delay causes of two groups contractors were measured using Spearman Rank Correlation Coefficients. The results showed that the large and small contractors generally agree on the importance ranking of the individual delay variables. In relation to the groups of the delay variable, however, the result showed that there is no agreement between the two groups of contractors. The professional management group was ranked the highest and the external groups was ranked the lowest by large contractors. Whereas, small contractors ranked the design and documentation group as the highest and the execution group as the lowest.

Impact and interest:

Citation countsare sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

4,579 since deposited on 17 May 2006
1,781 in the past twelve months

Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 4156
Item Type: Conference Paper
Keywords: Delay, building projects, contractor, Indonesia
Subjects: Australian and New Zealand Standard Research Classification > BUILT ENVIRONMENT AND DESIGN (120000) > BUILDING (120200) > Building Construction Management and Project Planning (120201)
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Current > Research Centres > Sustainable Built Environment National Research Centre
Copyright Owner: Copyright 2003 (please consult author)
Deposited On: 17 May 2006
Last Modified: 04 Apr 2011 14:06

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page