Waste in the Indonesian construction projects

Alwi, Sugiharto, Hampson, Keith D., & Mohamed, Sherif A. (2002) Waste in the Indonesian construction projects. In 1st International Conference of CIB W107 - Creating a sustainable Construction Industry in Developing Countries, 11-13 November 2002, South Africa.

Abstract

Waste can significantly affect the business performance and productivity of contracting organisations. This paper aims to investigate the incidence of waste within contractors companies in Indonesia, focusing on non-residential building and infrastructure projects. Based on respondents’ perceptions, data was collected through questionnaires and followed up by personal interviews. Paired-samples t-test was performed to group the importance of waste variables and waste causes variables. The findings suggest that six factors were found to be the key variables of waste including repair on finishing works, waiting for materials, delays to schedule, slow tradesmen, waste of raw materials on-site and lack of supervision. Whereas design changes, slowness in making decisions, lack of trades’ skill, inappropriate construction methods, poor coordination among project participants, delay of material delivery to site and poor planning and scheduling were identified as the key variables causing waste. This paper recommends a simple method of waste identification to assist construction managers to detect any waste that may occur during the construction process. To provide the best outcome of contractors’ performance, several alternative solutions were suggested to be applied on-site.

Impact and interest:

Citation countsare sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

1,315 since deposited on 17 May 2006
266 in the past twelve months

Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 4163
Item Type: Conference Paper
Keywords: Non value, adding activities, Contractors, Indonesia, Lean Production
ISBN: 0798855444
Subjects: Australian and New Zealand Standard Research Classification > BUILT ENVIRONMENT AND DESIGN (120000) > BUILDING (120200) > Building Construction Management and Project Planning (120201)
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Current > Research Centres > Sustainable Built Environment National Research Centre
Copyright Owner: Copyright 2002 (please consult author)
Deposited On: 17 May 2006
Last Modified: 04 Apr 2011 14:08

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page