QUT ePrints

Development of network-level project screening methods supporting the 4-Year pavement management plan in Texas

Chi, Seokho, Hwang, Jaewon , Arellano, Mike , Zhang, Zhanmin , & Murphy, Mike (2013) Development of network-level project screening methods supporting the 4-Year pavement management plan in Texas. Journal of Management in Engineering, 29(4), pp. 482-494.

View at publisher (open access)

Abstract

The Texas Department of Transportation (TxDOT) is concerned about the widening gap between pavement preservation needs and available funding. Thus, the TxDOT Austin District Pavement Engineer (DPE) has investigated methods to strategically allocate available pavement funding to potential projects that improve the overall performance of the District and Texas highway systems. The primary objective of the study presented in this paper is to develop a network-level project screening and ranking method that supports the Austin District 4-year pavement management plan development. The study developed candidate project selection and ranking algorithms that evaluated pavement conditions of each project candidate using data contained in the Pavement Management Information system (PMIS) database and incorporated insights from Austin District pavement experts; and implemented the developed method and supporting algorithm. This process previously required weeks to complete, but now requires about 10 minutes including data preparation and running the analysis algorithm, which enables the Austin DPE to devote more time and resources to conducting field visits, performing project-level evaluation and testing candidate projects. The case study results showed that the proposed method assisted the DPE in evaluating and prioritizing projects and allocating funds to the right projects at the right time.

Impact and interest:

0 citations in Scopus
Search Google Scholar™
0 citations in Web of Science®

Citation countsare sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

9 since deposited on 13 Sep 2012
8 in the past twelve months

Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 53590
Item Type: Journal Article
Additional URLs:
Keywords: Pavement maintenance, Network-level project screening, Project ranking, 4-year pavement management plan
DOI: 10.1061/(ASCE)ME.1943-5479.0000158
ISSN: 0742-597X
Subjects: Australian and New Zealand Standard Research Classification > ENGINEERING (090000) > CIVIL ENGINEERING (090500)
Divisions: Current > Schools > School of Civil Engineering & Built Environment
Current > QUT Faculties and Divisions > Science & Engineering Faculty
Copyright Owner: Copyright 2013 American Society of Civil Engineers
Deposited On: 14 Sep 2012 09:37
Last Modified: 02 Dec 2013 17:36

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page