In Australia, and elsewhere, the movement of trains on long-haul rail networks is usually planned in advance. Typically, a train plan is developed to confirm that the required train movements and track maintenance activities can occur. The plan specifies when track segments will be occupied by particular trains and maintenance activities. On the day of operation, a train controller monitors and controls the movement of trains and maintenance crews, and updates the train plan in response to unplanned disruptions.

It can be difficult to predict how good a plan will be in practice. The main performance indicator for a train service should be reliability - the proportion of trains running the service that complete at or before the scheduled time.

We define the robustness of a planned train service to be the expected reliability. The robustness of individual train services and for a train plan as a whole can be estimated by simulating the train plan many times with random, but realistic, perturbations to train departure times and segment durations, and then analysing the distributions of arrival times. This process can also be used to set arrival times that will achieve a desired level of robustness for each train service.

Impact and interest:

1 citations in Scopus
Search Google Scholar™
1 citations in Web of Science®

Citation counts are sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

52 since deposited on 12 Sep 2013
22 in the past twelve months

Full-text downloads displays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 62416
Item Type: Journal Article
Refereed: Yes
Keywords: train planning, robustness, Monte-Carlo
DOI: 10.1177/0954409713501295
ISSN: 0954-4097
Subjects: Australian and New Zealand Standard Research Classification > ENGINEERING (090000) > CIVIL ENGINEERING (090500) > Transport Engineering (090507)
Divisions: Current > Schools > School of Civil Engineering & Built Environment
Current > QUT Faculties and Divisions > Science & Engineering Faculty
Copyright Owner: Copyright 2013 Institute of Mechanical Engineers
Deposited On: 12 Sep 2013 00:31
Last Modified: 06 Sep 2014 01:42

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page