Non-productive activity time measurement as a base for construction workers productivity improvement

Djatnika, Suntana S., Soepandji, Budi S., Abidin, Ismeth S. , & Trigunarsyah, Bambang (2006) Non-productive activity time measurement as a base for construction workers productivity improvement. In Kanok-Nukulchai, Worsak, Munasinghe, Sunil, & Anwar, Naveed (Eds.) The Tenth East Asia-Pacific Conference on Structural Engineering and Construction, August 3-5, 2006, Bangkok, Thailand.

[img] PDF (927kB)
Administrators only

Abstract

A practical system for measuring worker productivity is an essential prerequisite for the design of national and regional construction labor productivity improvement programs in Indonesia. It is important, because labor not only constitutes a large part of construction cost, but also susceptible to the influence of construction management. Indonesian construction industry needs a series of productivity indices, which should be designed to allow contractors to compare the performance of their projects with other similar projects, and to analyze different type of construction processes in order to identify problem areas and potential for productivity improvement at the source of problems. Appropriate construction productivity measurement provides the basis for determining trends and levels of productivity as well as the impacts of corrective action. It will assist project owners and construction managers: to manage projects effectively; to detect problems and adverse trends for necessary corrective action; to determine impacts of changed construction methods or conditions; to identify high and low areas of productivity and reasons for the differences; to compare project performance by region; to compare performance of different contractors; and to provide a means to assess cost effectiveness in construction. This paper discusses the method for measuring standard worker’s performance and productivity rates for improving construction cost estimation, and for assisting the definition of worker/job performance standards. Observations had been conducted in selected road and bridge construction projects at 13 provinces in Indonesia. Data obtained from observation of work processes and time measurements at the various construction sites were evaluated and analyzed to obtain productivity and performance indicators at project, regional and national levels. Non-productive activity time measurement will then be used as a tool to improve the worker performance by introducing corrective and preventive actions for every non-productive working elemen.

Impact and interest:

0 citations in Scopus
Search Google Scholar™

Citation countsare sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

ID Code: 6550
Item Type: Conference Paper
Additional Information: Access to the author manuscript version is currently restricted pending permission from the publisher. For more information, please refer to the journal’s website (see hypertext link) or contact the author: bambang.trigunarsyah@qut.edu.au
Additional URLs:
Keywords: Productivity, non, productive activity time, work performance, productivity rates, corrective and preventive actions
Subjects: Australian and New Zealand Standard Research Classification > ENGINEERING (090000) > CIVIL ENGINEERING (090500) > Construction Engineering (090502)
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Copyright Owner: Copyright, 2006 by School of Engineering and Technology, Asian Institute of Technology
Deposited On: 19 Mar 2007
Last Modified: 10 Aug 2011 22:56

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page