A short-term production scheduling methodology for open-pit mines

Liu, Shi Qiang, Kozan, Erhan, & Wolff, Rodney (2013) A short-term production scheduling methodology for open-pit mines. In Costa, J. (Ed.) International Symposium on the 36th Applications of Computers and Operations Research in the Mineral Industry (36th APCOM), Fundaco Luiz Englert, Brazil, pp. 465-469.

Abstract

A multi-resource multi-stage scheduling methodology is developed to solve short-term open-pit mine production scheduling problems as a generic multi-resource multi-stage scheduling problem. It is modelled using essential characteristics of short-term mining production operations such as drilling, sampling, blasting and excavating under the capacity constraints of mining equipment at each processing stage. Based on an extended disjunctive graph model, a shifting-bottleneck-procedure algorithm is enhanced and applied to obtain feasible short-term open-pit mine production schedules and near-optimal solutions. The proposed methodology and its solution quality are verified and validated using a real mining case study.

Impact and interest:

Citation counts are sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

185 since deposited on 06 Feb 2014
29 in the past twelve months

Full-text downloads displays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 67057
Item Type: Conference Paper
Refereed: Yes
Keywords: open-pit mining, mine production, multi-resource multi-stage scheduling, shifting-bottleneck-procedure algorithm
ISBN: 9788561155025
Subjects: Australian and New Zealand Standard Research Classification > MATHEMATICAL SCIENCES (010000) > APPLIED MATHEMATICS (010200) > Operations Research (010206)
Australian and New Zealand Standard Research Classification > ENGINEERING (090000) > RESOURCES ENGINEERING AND EXTRACTIVE METALLURGY (091400) > Mining Engineering (091405)
Divisions: Current > Research Centres > Palliative Care Research and Education
Current > QUT Faculties and Divisions > Science & Engineering Faculty
Past > Schools > Mathematical Sciences
Copyright Owner: Copyright 2013 Please consult the authors
Deposited On: 06 Feb 2014 22:52
Last Modified: 03 May 2014 13:04

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page