Application of cross validation techniques for modelling construction costs during the very early design stage

Cheung, Franco K.T. & Skitmore, Martin (2006) Application of cross validation techniques for modelling construction costs during the very early design stage. Building and Environment, 41(12), pp. 1973-1990.

View at publisher

Abstract

Building client/owners need estimates of likely construction costs for budgeting purposes early in the procurement process when little detailed design information is available beyond the type, size and location of the facility. One of the more sophisticated techniques available for this purpose is the Storey Enclosure Method, developed by James in 1954. This uses the basic physical measurements of the building envelope, together with an arbitrary set of multipliers, or weights, to forecast tender/bid prices. Although seldom used in practice, James succeeded in showing his method to be capable of significantly outperforming alternative approaches. The research reported in this paper aimed firstly to reassess James’ claims with new data and secondly to advance his method by using regression techniques to obtain the weights involved. Based on data from 138 completed Hong Kong projects for four types of building, two types of regression models were developed. This involved the use of sophisticated features such as leave-one-out cross validation to simulate the way in which forecasts are produced in practice and a dual stepwise selection strategy that enhances the chance of identifying the best model. An algorithm was also designed to select the appropriate parametric and non-parametric tests for objective and rigorous model evaluation against alternatives. The results indicate that, contrary to James’ claim, both his original method and the two regression-based alternatives are not significantly better or worse than other models. Surprisingly, the widely used floor area model was found to under-perform in terms of consistency for offices and private housing. For private housing in particular, it was felt that the Storey Enclosure Method was likely to offer good prospects of improvement on those methods currently in use in practice.

Impact and interest:

5 citations in Scopus
Search Google Scholar™
1 citations in Web of Science®

Citation countsare sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

589 since deposited on 14 Sep 2007
60 in the past twelve months

Full-text downloadsdisplays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 9410
Item Type: Journal Article
Keywords: Price forecasting, early stage, Storey Enclosure Method, cost model, cross validation, forecasting accuracy
DOI: 10.1016/j.buildenv.2005.09.011
ISSN: 0360-1323
Subjects: Australian and New Zealand Standard Research Classification > BUILT ENVIRONMENT AND DESIGN (120000) > BUILDING (120200) > Quantity Surveying (120203)
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Past > Schools > School of Urban Development
Copyright Owner: Copyright 2006 Elsevier
Copyright Statement: Reproduced in accordance with the copyright policy of the publisher.
Deposited On: 14 Sep 2007
Last Modified: 29 Feb 2012 23:21

Export: EndNote | Dublin Core | BibTeX

Repository Staff Only: item control page