QUT QUT ePrints

Person: Abidin, Ismeth

Number of items: 9.

Latif, Yusuf and Abidin, Ismeth and Trigunarsyah, Bambang (2008) Knowledge-based Material Cost Control for Building Construction Project using Expert System Approach. In Haigh, Richard and Amaratunga, Dilanthi, Eds. Proceedings CIB International Conference on Building Education and Research 2008, pages pp. 1969-1978, Heritance Kandalama, Sri Lanka.

Sudarto, S. and Trigunarsyah, Bambang and Abidin, Ismeth S. and Soepandji, Budi S. (2007) Identification of the cause of external factor problems that influence construction company’s performance in Indonesia. In Xie, Y. M. and Patnaikuni, I., Eds. Proceedings 4th International Structural Engineering and Construction Conference (ISEC-4) 2, pages pp. 1349-1354, Melbourne, Australia.

Sudarto, S. and Trigunarsyah, Bambang and Abidin, Ismeth (2007) Lesson learned corrective action in internal factors of construction company in Indonesia. In Ahmed, Syed M. and Azhar, Salman and Mohamed, Sherif A., Eds. Proceedings Fourth International Conference on Construction in the 21st Century - Accelerating Innovation in Engineering, Management and Technology, pages pp. 495-503, Gold Coast, Australia.

Soeparto, Hari G. and Soepandji, Budi S. and Abidin, Ismeth and Trigunarsyah, Bambang (2007) Long term Indonesian construction industry’s aggregate productivity simulation considering overall business environment. In Ahmed, Syed M. and Azhar, Salman and Mohamed, Sherif A., Eds. Proceedings Fourth International Conference on Construction in the 21st Century - Accelerating Innovation in Engineering, Management and Technology, pages pp. 504-511, Gold Coast, Australia.

Sudarto, S. and Soepandji, Budi S. and Abidin, Ismeth S. and Trigunarsyah, Bambang (2006) Identification of the cause of internal factor problems that influence construction company’s performance in Indonesia. In Kanok-Nukulchai, Worsak and Munasinghe, Sunil and Anwar, Naveed, Eds. Proceedings The Tenth East Asia-Pacific Conference on Structural Engineering and Construction 05, pages pp. 79-84, Bangkok, Thailand.

Djatnika, Suntana S. and Soepandji, Budi S. and Abidin, Ismeth S. and Trigunarsyah, Bambang (2006) Non-productive activity time measurement as a base for construction workers productivity improvement. In Kanok-Nukulchai, Worsak and Munasinghe, Sunil and Anwar, Naveed, Eds. Proceedings The Tenth East Asia-Pacific Conference on Structural Engineering and Construction 05, pages pp. 119-124, Bangkok, Thailand.

Anondho, Basuki and Trigunarsyah, Bambang and Abidin, Ismeth S. (2006) Optimization numbers of labors composition calculation based on probabilistic condition. In Kanok-Nukulchai, Worsak and Munasinghe, Sunil and Anwar, Naveed, Eds. Proceedings The Tenth East Asia-Pacific Conference on Structural Engineering and Construction 05, pages pp. 151-156, Bangkok, Thailand.

Veronika, Alin and Trigunarsyah, Bambang and Latif, Yusuf and Abidin, Ismeth (2005) Rekomendasi Tindakan Koreksi Terhadap Penyimpangan Biaya Pembelian Material Konstruksi (Recommended Corrective Actions for Construction Material Cost Variance). Jurnal Teknik Sipil 12(3):pp. 159-165.

Riantini, Lani S. and Trigunarsyah, Bambang and Abidin, Ismeth and Latif, Yusuf (2005) Penentuan Peringkat Faktor Risiko dalam Rekrutment Tenaga Kerja yang Mempengaruhi Biaya Tenaga Kerja pada Proyek (Determination of Risk Ranking in Labours Recruitment which Influence Construction Project Cost). Jurnal Teknik Sipil 12(3):pp. 177-184.

This list was generated on Mon Oct 13 12:39:11 EST 2008.