QUT ePrints

Browse By Person: Liu, Shi Qiang

 Up a level
Export as [feed] RSS 1.0 [feed] Atom [feed] RSS 2.0 [feed] RSS 2.0
Group by: Item Type | Date
Number of items: 14.

Journal Article

Kozan, Erhan & Liu, Shi Qiang (2012) A demand-responsive decision support system for coal transportation. Decision Support Systems, 54(1), pp. 665-680.
Number of full-text downloads 62
Number of citations in Scopus 2
Number of citations in Web of Science® 1

Liu, Shi Qiang & Kozan, Erhan (2012) Optimum utilisation of rolling stocks for iron ore mining industries. Advanced Materials Research, 361, pp. 1529-1534.

Liu, Shi Qiang & Kozan, Erhan (2012) An interactive planning and scheduling framework for optimising pits-to-crushers operations. Industrial Engineering & Management Systems, 11(1), pp. 94-102.
Number of full-text downloads 84

Liu, Shi Qiang & Kozan, Erhan (2011) Scheduling Trains with Priorities : a no-wait blocking parallel-machine job-shop scheduling model. Transportation Science, 45(2), pp. 175-198.
Number of citations in Scopus 15
Number of citations in Web of Science® 11

Liu, Shi Qiang & Kozan, Erhan (2011) Optimising a coal rail network under capacity constraints. Flexible Service and Manufacturing, 23, pp. 90-110.
Number of citations in Scopus 1
Number of citations in Web of Science® 1

Liu, Shi Qiang & Kozan, Erhan (2011) A hybrid shifting bottleneck procedure algorithm for the parallel-machine job-shop scheduling problem. Journal of the Operational Research Society, 63, pp. 168-182.
Number of citations in Scopus 5
Number of citations in Web of Science® 5

Liu, Shi Qiang & Kozan, Erhan (2009) Scheduling a flow-shop with combined buffer conditions. International Journal of Production Economics, 117(2), pp. 371-380.
Number of citations in Scopus 15
Number of citations in Web of Science® 8

Liu, Shi Qiang & Kozan, Erhan (2009) Scheduling trains as a blocking parallel-machine job shop scheduling problem. Computers and Operations Research, 36(10), pp. 2840-2852.
Number of full-text downloads 463
Number of citations in Scopus 22
Number of citations in Web of Science® 12

Liu, Shi Qiang, Ong, Hoon Liong, & Ng, Kien Ming (2005) A fast tabu search algorithm for the group shop scheduling problem. Advances in Engineering Software, 36(8), pp. 533-539.
Number of citations in Scopus 14
Number of citations in Web of Science® 11

Liu, Shi Qiang & Kozan, Erhan (2004) Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem. Advances in Engineering Software, 36(3), pp. 199-205.
Number of citations in Scopus 28
Number of citations in Web of Science® 20

Liu, Shi Qiang & Ong, Hoon Liong (2004) Metaheuristics for the mixed shop scheduling problem. Asia-Pacific Journal of Operational Research, 21(1), pp. 97-115.
Number of citations in Scopus 10
Number of citations in Web of Science® 11

Liu, Shi Qiang & Ong, Hoong Liong (2002) A comparative study of algorithms for the flowshop scheduling problem. Asia Pacific Journal of Operational Research, 19(2), pp. 205-222.
Number of citations in Scopus 19
Number of citations in Web of Science® 17

Conference Paper

Liu, Shi Qiang, Kozan, Erhan, & Wolff, Rodney (2013) A short-term production scheduling methodology for open-pit mines. In Costa, J. (Ed.) International Symposium on the 36th Applications of Computers and Operations Research in the Mineral Industry (36th APCOM), Fundaco Luiz Englert, Brazil, pp. 465-469.
Number of full-text downloads 94

QUT Thesis

Liu, Shi-Qiang (2008) Modelling and solving train scheduling problems under capacity constraints. PhD thesis, Queensland University of Technology.
Number of full-text downloads 1,132

This list was generated on Sat Nov 22 05:53:02 2014 EST.