Items where Subject is "Australian and New Zealand Standard Research Classification > ENGINEERING (090000) > CIVIL ENGINEERING (090500) > Construction Engineering (090502)"
![]() | Up a level |
- Subjects classification (33141)
- Australian and New Zealand Standard Research Classification (33141)
- ENGINEERING (090000) (4710)
- CIVIL ENGINEERING (090500) (1125)
- Construction Engineering (090502) (65)
- CIVIL ENGINEERING (090500) (1125)
- ENGINEERING (090000) (4710)
- Australian and New Zealand Standard Research Classification (33141)
Group by: Authors/Creators | Item Type
Number of items at this level: 65.
A
Ahuja, Vanita & Yang, Jay (2006) Communication Protocol for Building Project Management - The Potential of I.T. Enhanced Approaches for the Indian Building Practice. In Baldwin, A, Hui, E, & Wong, F (Eds.) BEAR 2006: Construction Sustainability and Innovation: Proceedings of the CIB W89 International Conference on Building Education and Research, 10-13 April 2006, China, Hong Kong.
202
202Ahuja, Vanita, Yang, Jay, & Shankar, Ravi (2010) Benchmarking framework to measure extent of ICT adoption for building project management. Journal of Construction Engineering and Management, 136(5), pp. 538-545.
276
276Ahuja, Vanita, Yang, Jay, Skitmore, Martin, & Shankar, Ravi (2010) An empirical test of causal relationships of factors affecting ICT adoption for building project management : an Indian SME case study. Construction Innovation: information, process, management, 10(2), pp. 164-180.
104
104Alwi, Sugiharto, Keith, Hampson, & Sherif, Mohamed (2001) Effect of quality supervision on rework in the Indonesian context. Asia Pacific Building and Construction Management Journal, 6, pp. 2-6.
844
844Amor, Robert, Betts, Martin, Coetzee, Gustav, & Sexton, Martin (2002) Information Technology for Construction: Recent Work and Future Directions. Journal of Information Technology in Construction, 7(16), pp. 245-258.
2,045
20
2,045
20Anondho, Basuki, Trigunarsyah, Bambang, & Abidin, Ismeth S. (2006) Optimization numbers of labors composition calculation based on probabilistic condition. In Kanok-Nukulchai, Worsak, Munasinghe, Sunil, & Anwar, Naveed (Eds.) The Tenth East Asia-Pacific Conference on Structural Engineering and Construction, 3-5 August, Bangkok, Thailand.
B
Bakti, Erman & Trigunarsyah, Bambang (2003) Constructability Implementation at Corporate Level. In Hoedajanto, D., Imran, I., & Abduh, M. (Eds.) 9th East Asia-Pacific Conference on Structural Engineering and Construction (EASEC9), 16-18 December 2003, Bali, Indonesia.
952
952Bakti, Erman Surya, Abdul Majid, Muhd Zaimi Bin, Zin, Zin, Rosli Mohamad, & Trigunarsyah, Bambang (2011) Constructability improvement in sea water intake structure. Engineering, Construction and Architectural Management, 18(6). (In Press)
343
343Blismas, Nick, Lingard, Helen, & Wakefield, Ron (2005) The Effect of Supervisory Leadership Style on Group Level Safety Climate in the Australian Construction Industry. In Sidwell, A (Ed.) QUT Research Week 2005: Conference Proceedings, 4 July - 8 July 2005, Australia, Queensland, Brisbane.
C
Cheung, Esther, Chan, Albert, & Kajewski, Stephen L. (2009) Enhancing value for money in public private partnership projects : findings from a survey conducted in Hong Kong and Australia compared to findings from previous research in the UK. Journal of Financia Management of Property and Construction, 14(1), pp. 7-20.
919
919Cheung, Esther, Chan, Albert, & Kajewski, Stephen L. (2012) Factors contributing to successful public private partnership projects : comparing Hong Kong with Australia and the United Kingdom. Journal of Facilities Management, 10(1), pp. 45-58.
246
246Cheung, Esther, Chan, Albert, & Kajewski, Stephen L. (2009) Reasons for implementing public private partnership projects : perspectives from Hong Kong, Australian and British practitioners. Journal of Property Investment and Finance, 27(1), pp. 81-95.
736
3
736
3Cheung, Esther, Chan, Albert, & Kajewski, Stephen L. (2010) Suitability of procuring large public works by PPP in Hong Kong. Engineering, Construction and Architectural Management, 17(3), pp. 292-308.
85
3
85
3Cheung, Esther, Chan, Albert, & Kajewski, Stephen L. (2010) The public sector’s perspective on procuring public works projects : comparing the views of practitioners in Hong Kong and Australia. Journal of Civil Engineering and Management, 16(1).
93
4
4
93
4
4Cheung, Esther, Chan, Albert, & Kajewski, Stephen L. (2010) The researcher’s perspective on procuring public works projects. Structural Survey, 28(4).
99
99Chi, Seokho & Caldas, Carlos (2012) Image-based safety assessment : automated spatial safety risk identification of earthmoving and surface mining activities. Journal of Construction Engineering and Management, 138(3), pp. 341-351.
22
3
2
22
3
2Creedy, Garry (2005) Risk Factors Leading to Cost Over-Run in Highway Projects. In Sidwell, A (Ed.) Proceedings of The Queensland University of Technology Research Week International Conference, 4-8 July 2005, Australia, Queensland, Brisbane.
D
Djatnika, Suntana S., Soepandji, Budi S., Abidin, Ismeth S., & Trigunarsyah, Bambang (2006) Non-productive activity time measurement as a base for construction workers productivity improvement. In Kanok-Nukulchai, Worsak, Munasinghe, Sunil, & Anwar, Naveed (Eds.) The Tenth East Asia-Pacific Conference on Structural Engineering and Construction, August 3-5, 2006, Bangkok, Thailand.
F
Fawzia, Sabrina, Zhao, Xiao, & Al-Mahaidi, Riadh (2010) Bond-slip models for double strap joints strengthened by CFRP. Composite Structures, 92(9), pp. 2137-2145.
12
9
12
9Firmansyah, Bayu A., Veronika, Alin, & Trigunarsyah, Bambang (2006) Risk analysis in feasibility study of building construction project: case study - PT. Perusahaan Gas Negara Indonesia. In Kanok-Nukulchai, Worsak, Munasinghe, Sunil, & Anwar, Naveed (Eds.) The Tenth East Asia-Pacific Conference on Structural Engineering and Construction, August 3-5, 2006, Bangkok, Thailand.
12,233
12,233H
Heravitorbati, Amirhossein, Coffey, Vaughan, & Trigunarsyah, Bambang (2011) Assessment of requirements for establishment of a framework to enhance implementation of quality practices in building projects. International Journal of Innovation, Management and Technology, 2(6). (In Press)
38
38Humphreys, Matthew F. (2003) The use of polymer composites in construction. In 2003 International Conference on Smart and Sustainable Built Environment, November, 2003, Brisbane, Australia.
13,498
13,498Humphreys, Matthew F. & Francey, Kim L. (2004) An investigation into the rehabilitation of timber structures with fibre composite materials. In Deeks, Andrew J. & Hao, Hong (Eds.) Developments in Mechanics of Structures and Materials, December 2004, Perth, Western Australia.
1,665
1,665J
Jayasooriya, Ruwan, Thambiratnam, David, Perera, Nimal, & Kosse, Vladis (2009) Vulnerability assessment of multi-storey buildings to external blast loading. In Jaiswal, Sumeet & Wang, Liang (Eds.) Proceedings of the 2nd Infrastructure Theme Postgraduate Conference 2009 - Rethinking Sustainable Development: Planning, Infrastructure Engineering, design and Managing Urban Infrastructure, Queensland University of Technology, Queensland University of Technology, Brisbane, pp. 59-67.
36
36Jetann, Charles A., Thambiratnam, David P., Kajewski, Stephen L., & Farr, Andrew (2006) Dynamic behaviour of flat post-tensioned floor plates. In Proceedings of the 13th International Conference of Sound and Vibration, Vienna University of Technology, Vienna, Austria, pp. 1-8.
1,249
1,249K
Kajewski, Stephen L. (1996) PBL and Construction Management Education: An independent Learning Case Study. The Australian Institute of Building Papers, 1: Educat, pp. 20-31.
252
252Kajewski, Stephen L. & Weippert, Achim (2003) Online Remote Construction Management: A State-of-the-Art Report. Queensland University of Technology, Brisbane.
556
556Kajewski, Stephen L. & Weippert, Achim (2004) e-Tendering: Benefits, Challenges and Recommendations for Practice. In CRCCI International Conference: Clients Driving innovation, 25-27 October 2004, Surfers Paradise, Australia.
1,730
1,730Kajewski, Stephen L., Weippert, Achim, Remmers, Todd R., & McFallan, Stephen L. (2004) ICT in the Australian Construction industry: Status, training and Perspectives. In CRCCI International Confrence: Clients Driving innovation, 25-27 October 2004, Surfers Paradise, Australia.
722
722Kajewski, Stephen L., Weippert, Achim, & Tilley, Paul A. (2003) Online Remote Construction Management: Construction Project Case Studies. Queensland University of Technology, Brisbane.
1,189
1,189L
Latif, Yusuf, Abidin, Ismeth, & Trigunarsyah, Bambang (2008) Knowledge-based Material Cost Control for Building Construction Project using Expert System Approach. In Haigh, Richard & Amaratunga, Dilanthi (Eds.) CIB International Conference on Building Education and Research 2008, 11th – 15th February 2008, Heritance Kandalama, Sri Lanka.
1,112
1,112Lim, Soon & Yang, Jay (2006) Identifying the Potential and Processes of Australian Involvement in the Chinese Infrastructure Market. In Baldwin, A, Hui, E, & Wong, F (Eds.) BEAR 2006: Construction Sustainability and Innovation: Proceedings of the CIB W89 International Conference on Building Education and Research, 10-13 April 2006, China, Hong Kong.
25
25Lim, Soon Kam & Yang, Jay (2007) Enhancing Sustainability Deliverables for Infrastructure Project Delivery. In Lau, Stephen (Ed.) Creating livable, healthy and environmentally viable cities: an Asian perspective- Proceedings of the World Sustainable Building Conference 2007, The Hong Kong Professional Green Building Council (PGBC), Kowloon, Hong Kong, pp. 467-480.
40
40M
Manley, Karen & Marceau, Jane (2002) Integrated Manufacturing-Services Businesses in the Australian Building and Construction Sector. Australian Journal of Construction Economics and Building, 2(1), pp. 1-12.
335
335Mehdi Riazi, Salman Riazi, Skitmore, Martin, & Cheung, Yan Ki Fiona (2011) The use of supply chain management to reduce delays : Malaysian public sector construction projects. In Proceedings of the 6th Nordic Conference on Construction Economics and Organisation in Society Volume 2, Danish Building Research Institute, Aalborg University, Copenhagen, Denmark, pp. 403-414.
748
748N
Nazech, E. M., Zaldi, D., & Trigunarsyah, Bambang (2008) Identification of construction waste in road and highway construction projects. In Yang, Yeong-Bin, Leu, Liang-Jenq, Chen, Chuin-Shan, & Su, Po-Chieh (Eds.) Eleventh East Asia-Pacific Conference on Structural Engineering and Construction (EASEC-11), November 19-21, 2008, Taipei, Taiwan.
169
169Nazech, Elkhobar, Zaldi, Denanda, & Trigunarsyah, Bambang (2008) Identification of construction waste in road and highway construction projects. In Yang, Yeong-Bin, Leu, Liang-Jenq, Chen, Chuin-Shan, & Su, Po-Chieh (Eds.) The Eleventh East Asia-Pacific Conference on Engineering and Construction, 19-21 November 2008, Taipei, Taiwan.
284
284Nepal, Madhav Prasad & Park, Moonseo (2004) Downtime model development for construction equipment management. Engineering, Construction and Architectural Management, 11(3), pp. 199-210.
1
5
1
5R
Rahman, Azmeri, Bridge, Adrian, Rowlinson, Steve, & Kwok, Tommy (2011) Towards testing the eclectic paradigm on multinational contracting: an approach to reviewing and analysing secondary data. In Wang, Yaowu, Pang, Yongshi, & Shen, Geoffrey Q.P. (Eds.) Proceedings of the 2011 International Conference on Construction and Real Estate Management (ICCREM 2011), China Architecture & Building Press, Guangzhou University Business Hotel, Guangzhou, China, pp. 915-920.
77
77Riantini, Lani S., Trigunarsyah, Bambang, Abidin, Ismeth, & Latif, Yusuf (2005) Penentuan Peringkat Faktor Risiko dalam Rekrutment Tenaga Kerja yang Mempengaruhi Biaya Tenaga Kerja pada Proyek (Determination of Risk Ranking in Labours Recruitment which Influence Construction Project Cost). Jurnal Teknik Sipil, 12(3), pp. 177-184.
S
Saghatforoush, Ehsan, Hassim, Salihudin, Saleh Jaafar, Mohd., & Razali Abdul Kadir, Mohd. (2009) Assessment of critical constructability activities among Malaysian building contractors. American Journal of Scientific Research, pp. 15-25.
286
286Saghatforoush, Ehsan, Hassim, Salihudin, Saleh Jaafar, Mohd., & Razali Abdul Kadir, Mohd. (2009) Constructability implementation among Malaysian building contractors. European Journal of Scientific Research, 29(4), pp. 518-532.
444
10
444
10Sudarto, S., Soepandji, Budi S., Abidin, Ismeth S., & Trigunarsyah, Bambang (2006) Identification of the cause of internal factor problems that influence construction company’s performance in Indonesia. In Kanok-Nukulchai, Worsak, Munasinghe, Sunil, & Anwar, Naveed (Eds.) The Tenth East Asia-Pacific Conference on Structural Engineering and Construction, August 3-5, 2006, Bangkok, Thailand.
Sudarto, S., Trigunarsyah, Bambang, & Abidin, Ismeth (2007) Lesson learned corrective action in internal factors of construction company in Indonesia. In Ahmed, Syed M., Azhar, Salman, & Mohamed, Sherif A. (Eds.) Fourth International Conference on Construction in the 21st Century - Accelerating Innovation in Engineering, Management and Technology, 11-13 July, Gold Coast, Australia.
Sudarto, S., Trigunarsyah, Bambang, Abidin, Ismeth S., & Soepandji, Budi S. (2007) Identification of the cause of external factor problems that influence construction company’s performance in Indonesia. In Xie, Y. M. & Patnaikuni, I. (Eds.) 4th International Structural Engineering and Construction Conference (ISEC-4), 26-28 September, Melbourne, Australia.
Sultan, Basel M. & Kajewski, Stephen L. (2003) The Yemen construction industry: Readying the industry for the successful implementation of sustainability. In International Conference on Smart and Sustainable Built Environment, 19-21 November, 2003, Brisbane, Australia.
1,914
1,914Sultan, Basel M. & Kajewski, Stephen L. (2003) The behaviour of construction costs and affordability in developing countries: A Yemen case study. In Joint International Symposium of CIB working Comissions - Knowledge Construction, 22-24 October, 2003, Singapore.
2,256
2,256T
Trigunarsyah, Bambang (2004) Assessing the Owner’s Role in Improving Constructability of Construction Projects in Indonesia. In Hampson, Keith D. (Ed.) Clients Driving Innovation International Conference, 25 – 27 October 2004, Surfers Paradise, Australia.
679
679Trigunarsyah, Bambang (2006) Case Studies on Implementation of Constructability Improvement by Construction Project Owners in Indonesia. In Brown, Kerry, Hampson, Keith, & Brandon, Peter (Eds.) Clients Driving Innovation: Moving Ideas into Practice, 12-14 March 2006, Gold Coast, Australia.
870
870Trigunarsyah, Bambang (2004) Constructability Practices among Construction Contractors in Indonesia. Journal of Construction Engineering and Management, 130(5), pp. 656-669.
17
6
17
6Trigunarsyah, Bambang (2007) Project designers’ role in improving constructability of Indonesian construction projects. Construction Management and Economics, 25(2), pp. 207-215.
7
7Trigunarsyah, Bambang (2004) Project owners' role in improving constructability of construction projects: an example analysis for Indonesia. Construction Management and Economics, 22(8), 861 -876.
6
6Trigunarsyah, Bambang (2004) A review of current practice in constructability improvement: case studies on construction projects in Indonesia. Construction Management and Economics, 22(6), pp. 567-580.
3
3Trigunarsyah, Bambang, Coffey, Vaughan, & Willar, Debby (2011) An empirical study of applying ISO 9001 elements in large size Indonesian contractors. In Ahmed, Syed M. (Ed.) 6th International Conference on Construction in the 21st Century (CITC-VI), July 5-7, 2011, Kuala Lumpur, Malaysia.
342
342Trigunarsyah, Bambang & Putrianti, Nila (2008) Factors that Influence Contractor’s Risk Response Planning in Controlling Cost of Road Construction Project in Indonesia. In Haigh, Richard & Amaratunga, Dilanthi (Eds.) CIB International Conference on Building Education and Research 2008, 11th – 15th February 2008, Heritance Kandalama, Sri Lanka.
Trigunarsyah, Bambang, Sofyan, Irma G., & Hendi, H. (2006) House keeping management as a strategy to minimize construction waste in high rise building projects. In Kanok-Nukulchai, Worsak, Munasinghe, Sunil, & Anwar, Naveed (Eds.) The Tenth East Asia-Pacific Conference on Structural Engineering and Construction, August 3-5, 2006, Bangkok, Thailand.
1,309
1,309Trigunarsyah, Bambang & Young, David M. (2001) Constructability Issues in Indonesian Construction. In Singh, Amarjit (Ed.) Creative Systems in Structural and Construction Engineering: Proceedings of the First International Structural Engineering and Construction Conference, January 2001, Waikiki, Hawaii.
V
Veronika, Alin, Riantini, Leni S., & Trigunarsyah, Bambang (2006) Corrective action recommendation for project cost variance in construction material management. In Kanok-Nukulchai, Worsak, Munasinghe, Sunil, & Anwar, Naveed (Eds.) The Tenth East Asia-Pacific Conference on Structural Engineering and Construction, August 3-5, 2006, Bangkok, Thailand.
2,941
2,941Veronika, Alin, Trigunarsyah, Bambang, Latif, Yusuf, & Abidin, Ismeth (2005) Rekomendasi Tindakan Koreksi Terhadap Penyimpangan Biaya Pembelian Material Konstruksi (Recommended Corrective Actions for Construction Material Cost Variance). Jurnal Teknik Sipil, 12(3), pp. 159-165.
2,132
2,132W
Williamson, Brian J. & Demirbilek, Nur (2003) The potential for increasing thermal comfort through selection of construction types in Brisbane. In 41st Annual Conference of the Australian New Zealand Solar Energy Society, 26-29 November, Melbourne, Australia.
844
844Wood, David, Trigunarsyah, Bambang, & Duffield, Colin F. (2003) Education to Improve the Success of International Engineering Projects Undertaken in Indonesia. In Hoedajanto, D., Imran, I., & Abduh, M. (Eds.) 9th East Asia-Pacific Conference on Structural Engineering and Construction (EASEC9), 16-18 December 2003, Bali, Indonesia.
386
386Y
Yang, Jay (2006) Project Sites as Classrooms: an Australian Experience in Combining Sustainable Development Research with Educational Activities and Professional Practice. In Wei, W (Ed.) Proceedings for SASBE2006 2nd CIB International Conference on Smart and Sustainable Built Environments, 15-17 November 2006, China, Shanghai.
Yang, Jay & Zhang, Guomin (2006) Factors Influencing the Implementation of the Raised Floor System in Australian Office Buildings. Construction Management and Economics, 24(4-6), pp. 529-543.
2
2Z
Zeynalian, Mehran, Trigunarsyah, Bambang, & Ronagh, H. R (2013) Modification of advanced programmatic risk analysis and management model for the whole project life cycle’s risks. Journal of Construction Engineering and Management, 139(1), pp. 51-59.
24
24Zhu, Chunxue (2008) Rationality in bidding theory: a construction industry perspective. In Casensky, Martin, Ahmed, Vian, Eaton, David, & Sutrisna, Monty (Eds.) BuHu 8th International Postgraduate Research Conference, June 26th-27th 2008, The Czech Technical University of Prague (CVUT), Czech Republic.
756
756
