Factors influencing project team effectiveness to achieve quality of building projects in the kingdom of Saudi Arabia
|
Meshal Abdulaziz B Alharbi Thesis
(PDF 7MB)
Available under License Creative Commons Attribution Non-commercial No Derivatives 4.0. |
Description
This thesis investigated the organisational and project levels factors influencing team effectiveness to achieve quality of building projects in the KSA. Team effectiveness outcomes were also investigated. The research employed two data collection stages for quantitative and qualitative analysis. The survey was validated for evaluating perceived team effectiveness factors to achieve quality through the interviews. The principal component analysis and Thematic analysis were utilised. Relationships among team effectiveness factors were explored in the developed conceptual framework. The conceptual framework enables construction organisations to better understand the organisational and project levels influences on team effectiveness to achieve quality.
Impact and interest:
Citation counts are sourced monthly from Scopus and Web of Science® citation databases.
These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.
Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.
Full-text downloads:
Full-text downloads displays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.
ID Code: | 227840 |
---|---|
Item Type: | QUT Thesis (PhD) |
Supervisor: | Teo, Melissa & Drogemuller, Robin |
Keywords: | Construction industry, Construction management, Project team, Team effectiveness, Project quality |
DOI: | 10.5204/thesis.eprints.227840 |
Divisions: | Current > QUT Faculties and Divisions > Faculty of Engineering Current > Schools > School of Architecture & Built Environment |
Institution: | Queensland University of Technology |
Deposited On: | 22 Feb 2022 00:38 |
Last Modified: | 22 Feb 2022 00:38 |
Export: EndNote | Dublin Core | BibTeX
Repository Staff Only: item control page