Factors influencing construction productivity in the Indonsesian context

(2003) Factors influencing construction productivity in the Indonsesian context. In 5th EASTS Conference, 2003-10-29 - 2003-11-01.

This is the latest version of this eprint.

[img]
Preview
PDF (177kB)
4154_1.pdf.

Description

Many construction industry sectors have been experiencing chronic problems such as poor safety, inferior working conditions and insufficient quality. These problems have been identified as factors that affect construction’s productivity and will affect company’s performance. This paper investigates factors influencing construction productivity in Indonesia. Data was collected through questionnaires and personal interviews targeting non-residential building and infrastructure projects. Key factors influencing construction productivity and their causes were obtained through a series of statistical analyses based on the contracting companies’ approach. The findings suggest that the key factors and their causes were influenced by three issues: (1) characteristics of contractors; (2) inadequate management strategy; and (3) organisation’s focus. A conceptual model of factors influencing construction productivity was developed to provide the contractors with information on which factors they need to focus. In addition, five alternative solutions are recommended to be applied on-site to achieve the best outcome of contractors’ performance.

Impact and interest:

6 citations in Web of Science®
Search Google Scholar™

Citation counts are sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

1,276 since deposited on 23 May 2006
90 in the past twelve months

Full-text downloads displays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 4237
Item Type: Contribution to conference (Paper/Presentation)
Refereed: No
Keywords: Alternative solutions, Contractors, Indonesia, Productivity, Waste
Pure ID: 57189704
Divisions: Past > QUT Faculties & Divisions > Faculty of Built Environment and Engineering
Current > Research Centres > Australian Research Centre for Aerospace Automation
Copyright Owner: Copyright 2003 (please consult author)
Copyright Statement: This work is covered by copyright. Unless the document is being made available under a Creative Commons Licence, you must assume that re-use is limited to personal use and that permission from the copyright owner must be obtained for all other uses. If the document is available under a Creative Commons License (or other specified license) then refer to the Licence for details of permitted re-use. It is a condition of access that users recognise and abide by the legal requirements associated with these rights. If you believe that this work infringes copyright please provide details by email to qut.copyright@qut.edu.au
Deposited On: 23 May 2006 00:00
Last Modified: 03 Mar 2024 09:02

Available Versions of this Item