A hybrid shifting bottleneck procedure algorithm for the parallel machine job-shop scheduling problem

& (2012) A hybrid shifting bottleneck procedure algorithm for the parallel machine job-shop scheduling problem. Journal of the Operational Research Society, 63, pp. 168-182.

View at publisher

Description

In practice, parallel-machine job-shop scheduling (PMJSS) is very useful in the development of standard modelling approaches and generic solution techniques for many real-world scheduling problems. In this paper, based on the analysis of structural properties in an extended disjunctive graph model, a hybrid shifting bottleneck procedure (HSBP) algorithm combined with Tabu Search metaheuristic algorithm is developed to deal with the PMJSS problem. The original-version SBP algorithm for the job-shop scheduling (JSS) has been significantly improved to solve the PMJSS problem with four novelties: i) a topological-sequence algorithm is proposed to decompose the PMJSS problem into a set of single-machine scheduling (SMS) and/or parallel-machine scheduling (PMS) subproblems; ii) a modified Carlier algorithm based on the proposed lemmas and the proofs is developed to solve the SMS subproblem; iii) the Jackson rule is extended to solve the PMS subproblem; iv) a Tabu Search metaheuristic algorithm is embedded under the framework of SBP to optimise the JSS and PMJSS cases. The computational experiments show that the proposed HSBP is very efficient in solving the JSS and PMJSS problems.

Impact and interest:

36 citations in Scopus
32 citations in Web of Science®
Search Google Scholar™

Citation counts are sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

ID Code: 48665
Item Type: Contribution to Journal (Journal Article)
Refereed: Yes
ORCID iD:
Kozan, Erhanorcid.org/0000-0002-3208-702X
Measurements or Duration: 15 pages
Keywords: Heuristics, Job-shop, Metaheuristics, Parellel-machine, Scheduling, Shifting Bottleneck Procedure
DOI: 10.1057/jors.2011.4
ISSN: 0160-5682
Pure ID: 32321624
Divisions: Past > QUT Faculties & Divisions > Faculty of Science and Technology
Past > QUT Faculties & Divisions > Science & Engineering Faculty
Current > Research Centres > Australian Research Centre for Aerospace Automation
Past > Research Centres > Science Research Centre
Copyright Owner: Consult author(s) regarding copyright matters
Copyright Statement: This work is covered by copyright. Unless the document is being made available under a Creative Commons Licence, you must assume that re-use is limited to personal use and that permission from the copyright owner must be obtained for all other uses. If the document is available under a Creative Commons License (or other specified license) then refer to the Licence for details of permitted re-use. It is a condition of access that users recognise and abide by the legal requirements associated with these rights. If you believe that this work infringes copyright please provide details by email to qut.copyright@qut.edu.au
Deposited On: 17 Feb 2012 01:24
Last Modified: 02 Mar 2024 06:57