A hybrid constructive heuristic and simulated annealing for railway crew scheduling

& (2014) A hybrid constructive heuristic and simulated annealing for railway crew scheduling. Computers and Industrial Engineering, 70, pp. 11-19.

[img]
Preview
Accepted Version (PDF 934kB)
Paper_A_Hybrid_Constructive_Heuristic_with_Simulated_Annealing_(final_draft).pdf.
Available under License Creative Commons Attribution Non-commercial No Derivatives 2.5.

View at publisher

Description

Railway crew scheduling problem is the process of allocating train services to the crew duties based on the published train timetable while satisfying operational and contractual requirements. The problem is restricted by many constraints and it belongs to the class of NP-hard. In this paper, we develop a mathematical model for railway crew scheduling with the aim of minimising the number of crew duties by reducing idle transition times. Duties are generated by arranging scheduled trips over a set of duties and sequentially ordering the set of trips within each of duties. The optimisation model includes the time period of relief opportunities within which a train crew can be relieved at any relief point. Existing models and algorithms usually only consider relieving a crew at the beginning of the interval of relief opportunities which may be impractical. This model involves a large number of decision variables and constraints, and therefore a hybrid constructive heuristic with the simulated annealing search algorithm is applied to yield an optimal or near-optimal schedule. The performance of the proposed algorithms is evaluated by applying computational experiments on randomly generated test instances. The results show that the proposed approaches obtain near-optimal solutions in a reasonable computational time for large-sized problems.

Impact and interest:

45 citations in Scopus
37 citations in Web of Science®
Search Google Scholar™

Citation counts are sourced monthly from Scopus and Web of Science® citation databases.

These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.

Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.

Full-text downloads:

350 since deposited on 27 Jan 2014
40 in the past twelve months

Full-text downloads displays the total number of times this work’s files (e.g., a PDF) have been downloaded from QUT ePrints as well as the number of downloads in the previous 365 days. The count includes downloads for all files if a work has more than one.

ID Code: 66685
Item Type: Contribution to Journal (Journal Article)
Refereed: Yes
ORCID iD:
Kozan, Erhanorcid.org/0000-0002-3208-702X
Measurements or Duration: 9 pages
Keywords: combinatorial optimisation, constructive heuristics, mathematical programming, railway crew scheduling, simulated annealing
DOI: 10.1016/j.cie.2014.01.002
ISSN: 0360-8352
Pure ID: 32675852
Divisions: Past > Institutes > Institute for Future Environments
Past > QUT Faculties & Divisions > Science & Engineering Faculty
Current > Schools > School of Mathematical Sciences
Current > Research Centres > Centre for Tropical Crops and Biocommodities
Copyright Owner: Consult author(s) regarding copyright matters
Copyright Statement: This work is covered by copyright. Unless the document is being made available under a Creative Commons Licence, you must assume that re-use is limited to personal use and that permission from the copyright owner must be obtained for all other uses. If the document is available under a Creative Commons License (or other specified license) then refer to the Licence for details of permitted re-use. It is a condition of access that users recognise and abide by the legal requirements associated with these rights. If you believe that this work infringes copyright please provide details by email to qut.copyright@qut.edu.au
Deposited On: 27 Jan 2014 23:54
Last Modified: 31 Jul 2025 20:27